Construction in Township

Daversa Construction Company is working for Comcast installing conduit in the Township Right-of-Ways.  If you have any issues, please call them at 717-334-9553. C&R Directional Boring, LLC is doing work for the Walker Township Water Association installing a new water line in the Township Right of Way.  Any issues, please call them at 814-383-9955.  

2025 SUMMER CAMP

The 2025 Walker Township Summer Camp will be held June 23 – July 31.  Pavilion A and B will be reserved for campers from 9:00am to 2:00pm

Compost Area

THE TOWNSHIP IS ACCEPTING BRUSH, GRASS, AND LEAVES AT OUR COMPOSTING AREA ON ZION BACK ROAD.  THE GATE WILL BE OPEN 24/7.  PLEASE FOLLOW THE DIRECTIONS ON THE SIGNS. THIS SERVICE IS FOR WALKER TOWNSHIP RESIDENTS ONLY, PLEASE NO ILLEGAL DUMPING.